PROJECTS
We have worked projects large & small across the US, most recently in the Delaware, Midland, and Anadarko Basins.
​
​
Well costs are directly tied to the numbers of days the drilling rig is on location. JGL Consulting helped a seasoned Delaware Operator steepen their learning curve, enabling them to learn 6 times faster than they were able to do on their own.
​
2 years own their own: 14% reduction in Spud-TD Time
10 months with JGL: 28% reduction in shallow horizon Spud-TD Time
10 months with JGL: 40% reduction in deep horizon Spud-TD Time
​
​
With these performance improvements the Operator is now delivering the same number of wells with 2 fewer drilling rigs, saving $2.5 Million/month.
ABOUT US
We are drilling professionals with know-how to reduce your well costs, having experience in virtually every US Basin. Broad experience means we have seen most drilling problems before.
While we cannot change your rock, we can plan around or plan away most problems.
​
​
We can help with offset analysis, writing AFEs, selecting best bits, designing BHAs, vendor selection, rig contracting, failure analysis, wellsite supervision, plug drillouts, and any other drilling engineering need.
​We are well versed in the needs & concerns of geology, geophysics, completions, production, and reservoir departments for both development and exploration projects. We can interface with all levels and have regularly presented to Private Equity and Fortune 500 Executives.
​